The Project

Phase 1

Phase 2

Give

See below a gallery of the latest on site.

Ground floor: the foyer
Ground floor: taken from the foyer looking up to the Mezzanine level and into the kitchen
Ground floor: looking into the centre hall
Ground floor: the lift shaft
Ground floor: taken from the centre hall looking into the storage and play area
Ground floor: toilets and showers will line the east wall
Ground floor: the staircase will wrap around the pillar to the opening in the ceiling
Ground floor: looking back to the link corridor to the Atrium
Mezzanine level: plant and youth room
Mezzanine level: looking down to the foyer
First floor: hiring spaces
First floor: hiring spaces
First floor: church office view
First floor: the stairs from the foyer
The roof view
The roof view
The roof view
The roof view
The roof view
The roof view